Projects

Projects

Insulation Upgraded at Animal Feed Factory in Yorkshire

Investment in energy conserving thermal insulation is often overlooked even though the financial savings can be significant and the pay back periods surprising. Total Thermal Services Ltd was proud to be contracted to remove existing failing insulation and replace with new to both process pipework…

Protective Insulation Jackets for Harsh Environments

Process equipment is increasing being required to operate and significant sub-zero temperatures and high-tech insulation jackets can provide a solution to protect and ensure operational performance. Experiencing ambient temperatures as low as minus 50°C the featured jacket incorporates 50mm thick closed cell nitrile rubber insulation infill.

High Temperature Component Testing Jackets for F1 Racing Team

Components within a Formula One racing cars experience extreme temperatures and testing regimes are extensive. Total Thermal Services provide high temperature heater jackets for many different applications including PID controllers for very close temperature control.

Heat Recovery Ductwork Insulated

I recent times alternative coverings for external insulated ductwork have been launched onto the market which on occasions have proved to be problematic. Birds pecking at the covering resulting in water ingress has been the biggest problem. Total Thermal Services Ltd has adopted an “aluminium…

Boileroom Pipework Insulated for Replacement Boilers

A programme of replacing existing boilers with energy efficient modern boilers is taking place nationally and Total Thermal Services is participating in this process by insulating the associated pipework. The featured project includes high performance phenolic foam insulation with Isogenopak cladding finish.

Oil Jacketed Bitumen Pipework Insulated & Clad

As part of an expansion programme by a national company we have we have recently completed insulation work on a new asphalt plant in Yorkshire. Insulation was provided to oil jacketed bitumen delivery & return pipework.

A New Acrylic Production Line Insulated & Clad

Mobilised at short notice we have recently completed insulation work on a new acrylic powder production line for an international manufacturer. Insulation systems provided incorporated steam & condensate, process hot water pipework, heat exchanger, filtration vessel and process dryer.

Tailor Made Insulation Jackets Save Energy and Keep the Koi Carp Warm

At sub-zero temperatures the heat loss from two Oase Biotech Screenmatic filters equated to 3.2 kW. These filters are part of a filtration system for 2 No. Internal Koi Carp ponds maintained @ +22°C. The application of tailor made insulation jackets by Total Thermal Services…

A Solution for Crystallisation of Stored Sodium Bisulphite recently provided

We have successfully provided a combined Trace Heating and Thermal Insulation package to maintain the temperature of stored Sodium Bisulphite at Baglan Bay Power Station. A temperature controlled trace heating design to compensate for heat loss with insulation and cladding has ensured no crystallisation problems…