Winter is fast approaching and a frozen mains water pipe would shut down the recently refurbished Cleethorpes Pier.
During the refurbishment of the Pier, Total Thermal Services Ltd provided an Electrical Trace Heating and Thermal Insulation System to the water main routed on the underside of the Pier for Frost Protection.